Dundas Street Parkade, Toronto Eaton Centre
CONSULTANT: Trow Consulting Engineers Ltd.
SCOPE: Ongoing slab removal and replacement of sections of the helix ramp. In 1999 both the ninth and seventh floors have been completed.
Work needed to be completed within the constrains of a tight schedule which required us to design a shoring system to accommodate traffic directly below
our work area.
- post tension cables
- total slab removal and replacement
- mastic waterproofing
- extensive traffic control