450 Walmer Road, Toronto
CONSULTANT: Construction Control Inc.
SCOPE: Total structural slab removal and replacement in the underground parking garage. (approx. 25,000 s.f.)
The work had to be carried out in two phases due to tight parking
constraints. Shoring and scaffolding designs allowed for tenant
garbage disposal operations to continue through the parking garage.
- shoring design and installation
- new garage slab design and engineering
- traffic topping installation
- new fire protection services
- new mechanical and electrical systems
- new column connection design and installation